St John’s Wood Painters & Decorators
A quotation built around the work
Room counts are only the beginning. The surfaces, their condition and the standard of preparation define the work to be priced.

Give enough information to distinguish the scope
List walls, ceilings, woodwork, windows and wallcoverings separately. Note the approximate room dimensions and any difficult access. Photographs help explain the current condition, but concealed defects and repair needs may require further assessment.
Compare like with like
Check that quotations describe the same surfaces, preparation and products. Identify whether repairs, stripping, lining, protection, access equipment and waste handling are included. A description such as paint bedroom leaves too much unresolved if one price includes the joinery and another does not.
Resolve provisional decisions
Where the condition beneath an existing finish is unknown, ask how it will be assessed and how any additional work will be agreed. Confirm responsibility for material supply and sample approval. Keep the agreed specification available if you later change the colour, product or extent of the work.
Agree the arrangements before a start date
The project needs agreed terms, payment arrangements and a sequence that works for the property. Discuss any consents, building requirements and access permissions in advance. Sending an enquiry starts that conversation; it does not confirm a booking or availability.
The lines a written quotation ought to draw
A useful quotation is a list of decisions, not a single figure with a room count beside it. It should say which rooms or elevations are included and which are not. Within a room it should separate ceilings, walls, joinery and any wallcovering, because those are different preparations even when they share a colour. It should name the preparation that has been assumed: a wash and a local fill, a lining, a strip, or a repair by someone else before decoration starts. It should name the products where they have been chosen, and it should say what happens if they have not. Access equipment, protection, waste and making good to the extent described belong in the same document, either as included or as excluded. So do provisional items, where the condition under a coating is unknown and a price cannot honestly be fixed. The way those provisional items will be looked at and authorised should be written down before work starts. Payment arrangements and the sequence belong there too. An enquiry is not that document. Sending photographs begins the conversation. It does not reserve a date, and it does not create the terms.
Photographs, measurements and the defects a picture cannot close
Send what lets someone see the job, and do not pretend the camera has finished the survey. For each room, a wide view and a close view of damage are more useful than a styled corner. Include ceilings, cornices, the worst wall and the joinery you want painted. For an exterior, include the whole elevation and a close view of cracked or hollow render, bare patches and the meeting with the next house. Approximate sizes help: floor area is a weak guide to wallpaper quantity, but ceiling heights and the number of doors and windows stop a guess from being wholly abstract. Say what the photograph cannot know. A stain may be dormant or active. A hairline crack may be old filler or movement. A sash may be stuck for reasons that are not visible from the pavement. Mark those as items for inspection rather than as defects you have already diagnosed. If rooms are above a shop, or on an upper floor of a block, say so, and include the stair or the lift in the pictures. Concealed grounds, failed putty and damp behind paper are reasons the first written scope may have to change after a visit.
Occupation, access and the exclusions to state at the start
The priceable part of a brief is often the life going on around the work. Say whether the home will be occupied, which rooms must stay available, and where furniture can stand. Say who will move fragile pieces and who will protect floors. For a flat, add the agent's rules, the floor level and whether the entrance door is yours to paint. For a house, add side passages, gardens, lightwells and any pavement or parking arrangement the access method needs. Permissions sit in the same pile: a listed-building consent if one is required, an approved colour if one exists, a landlord's condition, a permit that has or has not been obtained. Exclusions deserve plain language. Bare brick that must remain bare, a mural that must not be painted, a newly hung paper that is only to be made good at the edges, a room that is out of the job. Write them down. Provisional sums should name the uncertainty they cover, such as plaster repairs whose extent is hidden. They should not be a general cushion. If you are collecting quotations, send each bidder the same pack.
Request a quotation
Tell us about your property.
Share the address, the rooms or surfaces, and what you have in mind.
Your project details
Tell us what you would like to decorate and where.